NOFIRNO Firestop Installation Steps

CSD Sealing Systems products are simple and effective with noteable ease of installation, making it easier to achieve an effective fire protective, gas tight and water tight seal. See installation instructions for NOFIRNO Cable and Pipe Entries below.

NOFIRNO

Installation instructions for NOFIRNO cable and pipe entries.

Click on a step to view a bigger version. (Use the arrows to scroll)

STEP 1

STEP 1

For smaller sized conduit openings or for penetrations with low cable fill, a NOFIRNO 'solo' board system can be applied. Use is made of NOFIRNO coated boards and NOFIRNO sealant. In this case, more sealant is needed to obtain sufficient mechanical stability.

STEP 2

STEP 2

A NOFIRNO board is placed inside the penetration on top of the layer of NOFIRNO sealant. A layer of NOFIRNO sealant is also applied on top of the board as well, in order to assure effective stability and smoke tightness.

STEP 3

STEP 3

Then the cables are spread out on the NOFIRNO board inserted at the bottom of the conduit opening. Care has to be taken that sufficient NOFIRNO sealant is applied in between the cables. Seperation of the cables preferably about 5-10mm.

STEP 4

STEP 4

On top of the cable set, another layer of NOFIRNO sealant is applied to obtain optimum tightness between each of the cables an between the cables and the NOFIRNO boards. This also improves mechanical stability of the penetration seal.

STEP 5

STEP 5

The top NOFIRNO board is cut to size and tightly inserted into the open space of the conduit. The NOFIRNO board should be a bit oversized and can be forced into the opening using a wooden section and mallet.

STEP 6

STEP 6

Finally, all seams around the NOFIRNO  boards are sealed with NOFIRNO sealant. The NOFIRNO sealant can be smoothed by hand. Wet the hand with soap and water to avoid sealant sticking to the hand.

STEP 1

STEP 1

For smaller sized conduit openings or for penetrations with low cable fill, a NOFIRNO 'solo' board system can be applied. Use is made of NOFIRNO coated boards and NOFIRNO sealant. In this case, more sealant is needed to obtain sufficient mechanical stability.

STEP 2

STEP 2

A NOFIRNO board is placed inside the penetration on top of the layer of NOFIRNO sealant. A layer of NOFIRNO sealant is also applied on top of the board as well, in order to assure effective stability and smoke tightness.

STEP 3

STEP 3

Then the cables are spread out on the NOFIRNO board inserted at the bottom of the conduit opening. Care has to be taken that sufficient NOFIRNO sealant is applied in between the cables. Seperation of the cables preferably about 5-10mm.

STEP 4

STEP 4

On top of the cable set, another layer of NOFIRNO sealant is applied to obtain optimum tightness between each of the cables an between the cables and the NOFIRNO boards. This also improves mechanical stability of the penetration seal.

STEP 5

STEP 5

The top NOFIRNO board is cut to size and tightly inserted into the open space of the conduit. The NOFIRNO board should be a bit oversized and can be forced into the opening using a wooden section and mallet.

STEP 6

STEP 6

Finally, all seams around the NOFIRNO  boards are sealed with NOFIRNO sealant. The NOFIRNO sealant can be smoothed by hand. Wet the hand with soap and water to avoid sealant sticking to the hand.

Customer focused

At CSD, we understand that high-risk environments require the highest levels of safety that is why we offer on site training and quality inspections.

CSD products have been extensively tested by all major worldwide classification societies and independent institutes, and are proven to ensure the highest standards of quality, safety, reliability and durability.

Please contact us for any further product information or to order a copy of our brochures.

Latest News

When it comes to fire safety there can be no shortcuts

4th July 2017

As part of CSD Sealing Systems campaign to raise awareness of fire prevention and safety within buildings and specifically wh ...

Read more

Customer testimonials

See more testimonials

CSD provided OGN with first class support during the initial engineering stages and followed this through to the construction phase...
OGN Architectural Lead, Forties Alpha Satellite Platform, Project

© Copyright 2011 CSD Sealing Systems Limited

Legal Information - Terms and Conditions
Design by Boxmodel Website Designers