heathrow terminal 5
1

Heathrow Terminal 5

Client: AMEC, Scottish and Southern Energy and Laing O’Rourke
Location: Heathrow, UK
Date: 2007 - 2008

Project

Terminal 5 is an additional passenger terminal, offering one of the most advanced integrated passenger terminals in Europe connecting air, rail, bus and coach services. It consists of the main terminal building - which is big enough to accomodate 50 football pitches - 2 satellite buildings, 60 aircraft stands, an air traffic control tower, 4000 space multi storey car park, & along with acssociated infrastructure works.

The three companies were responsible for the design engineering and installation of services of the Terminal’s building. All have a longstanding history of using CSD products for sealing cable ducts and choosing RISE for its simplicity and speed of installation.

CSD aided the project in the installation of services by supplying RISE Duct kits and Actifoam products. These products were used throughout the Terminal’s substations and service tunnels.

Extensive on-site training has been carried out with all personnel installing the products and they have had a regular onsite presence throughout to assist with successful installation and to provide total customer satisfaction.

CSD’s products have been used to prevent gas and water ingress through cable ducts and to offer protection against rodents and rabbits entering substations.

“CSD Sealing Systems has consistently provided a first class technical support to our work at T5 backed by a prompt and efficient delivery service.”
(Peter Allington - AMEC)

For further information please email or find product details on our RISE Duct Seal here.

heathrow T5 case study
Click here to download a pdf version

Latest News

When it comes to fire safety there can be no shortcuts

4th July 2017

As part of CSD Sealing Systems campaign to raise awareness of fire prevention and safety within buildings and specifically wh ...

Read more

Customer testimonials

See more testimonials

CSD provided OGN with first class support during the initial engineering stages and followed this through to the construction phase...
OGN Architectural Lead, Forties Alpha Satellite Platform, Project

© Copyright 2011 CSD Sealing Systems Limited

Legal Information - Terms and Conditions
Design by Boxmodel Website Designers