Langeled pipeline image
1

Easington Gas Storage Facility - 2500 Ducts Sealed in 6 Weeks

Client: Amec
Location: East Yorkshire Coast, UK
Date: 2008

Project

The largest undersea pipeline in the world, the Langeled Pipeline, provides 20 per cent of Britain's gas supplies. The project consisted of sealing 2500 ducts in just six weeks before completion.

The gas receiving station based on the East Yorkshire coast, needed the 2500 cable entry ducts sealed to prevent gas and water ingress, and as cables entered buildings to provide fire protection too.

CSD was approached by Amec to survey the site and contracted a six week window to complete the work. In order to do this CSD needed to supply a huge amount of material quickly and so the CSD factory and its RISE extrusion lines worked continuously for over one week. In addition CSD trained 18 of Amec's personnel to install the 2500 cable entry duct seals.

The material was supplied and the quick method of installation saw all 2500 ducts sealed well within the six week window, ensuring no delay on the Langeled project.

With the RISE system, CSD provides a high performing gas and watertight seal tested to last in excess of 50 years, with the benefit of easily adding or removing cables at anytime in the future. The RISE Duct Seal, which is included within the current WIMES specification, ensures compliance with the DSEAR regulations, even in misshapen, rectangular and vertical ducts, with a large volume of cables passing through.

For further information please email or find product details on our RISE Duct Seal here.

amec pipeline case study

Click here to download a pdf version

Latest News

When it comes to fire safety there can be no shortcuts

4th July 2017

As part of CSD Sealing Systems campaign to raise awareness of fire prevention and safety within buildings and specifically wh ...

Read more

Customer testimonials

See more testimonials

...multi sleeves make packing the cable duct faster, especially in larger cable ducts or when sealing trefoil or large power cables. We will be using the RISE RAPID Duct seal on our future projects.
Gerco UK Ltd

© Copyright 2011 CSD Sealing Systems Limited

Legal Information - Terms and Conditions
Design by Boxmodel Website Designers