NOFIRNO® Multi Cable Transits

NOFIRNO® Multi Cable Transits

The world’s most versatile multi-cable sealing system. With decades of proven use worldwide, NOFIRNO® offers the reliability needed for mission-critical infrastructure. Its re-enterable, maintenance-free design means cables can be added, replaced or upgraded without compromising long-term protection.

NOFIRNO Multi Cable Transits
Multiple cables going through seal Pipes going through seal

NOFIRNO® Multi Cable Transits

The NOFIRNO® Multi-Cable Transit system is the proven solution for sealing grouped or mixed-diameter cables through walls, floors and bulkheads. With certified fire, water, gas and smoke resistance in a single system, it delivers unmatched performance and flexibility across civil, industrial, marine and offshore applications.

Key Benefits

  • Up to 4 hours fire resistance – independently tested and certified.
  • Watertight and gastight – pressure-tested up to 10 bar.
  • Handles complexity – seals mixed and high-density cable layouts in one system.
  • No frame required – flexible installation in round or irregular openings.
  • Future-ready – re-enterable for upgrades and maintenance.
  • Proven service life – over 50 years of age-tested integrity.

Designed For

  • Marine and offshore platforms
  • Civil and commercial construction
  • Power and utility networks
  • Transport and tunnel infrastructure
  • Data centres and telecoms

Useful Information

Find everything you need to specify, install and maintain CSD systems. Access the latest datasheets, certifications and installation guides, all in one place.

The installation advantage

Supplied as a complete system with clear installation guides and videos, NOFIRNO® Multi-Cable Transits make sealing complex penetrations straightforward. With no special frames or tools required, installation is fast, clean and reliable.

Contact Us
High speed train in motion on the railway station
“CSD Technical Services delivered the water, and gastight sealing works to a high standard across our control room and DNO substation. Their support contributed effectively to our wider climate action plan, including the installation of a new solar farm and battery storage system. We were very satisfied with the work and will be considering CSD for future projects.”

CSD client

Morrison Data Services