NOFIRNO®/Cer Flexible Pipe Penetration Seals

NOFIRNO®/Cer Flexible Pipe Penetration Seals

Premium protection in every environment. Seal out risk. Seal in confidence.

024-DavidLawsonPhotography
Pipe going through seal Pipes going through seal

NOFIRNO®/Cer Flexible Pipe Penetration Seals

Engineered for critical infrastructure, the NOFIRNO® Duct Seal system is the go-to solution for high-performance protection in underground and above-ground ducting.

Whether it’s a fibre optic rollout, a utility substation, or a high-risk industrial environment, NOFIRNO® delivers unmatched resistance to fire, water, gas, and rodent ingress – all in one flexible, low-maintenance system.

With over 100,000 kits installed across the UK, NOFIRNO® is a trusted choice for clients who demand long-term reliability without compromise.

Key Benefits

  • Up to 4 hours fire resistance – independently tested and certified.
  • Watertight and gastight – pressure-tested up to 10 bar in small openings.
  • No frame required – flexible installation in any shape or size duct.
  • Future-proofed – easy re-entry for adding or replacing services.
  • Proven longevity – over 50 years of age-tested sealing integrity.

Design for

  • Power and utility networks
  • Data centres
  • Transportation infrastructure
  • Civil and commercial construction
  • Renewable energy facilities

Useful Information

Engineered for critical infrastructure, the NOFIRNO®
Duct Seal system is the go-to solution for high-performance protection in underground and above-ground ducting

The installation advantage

Available as a complete kit with simplified instructions and access to our online installation video hub, the NOFIRNO® Duct Seal helps your team get the job done faster and with full confidence. Or, let our CSD Technical Services team handle everything – from design to installation to inspection.

Contact Us
High speed train in motion on the railway station
“CSD Technical Services delivered the water, and gastight sealing works to a high standard across our control room and DNO substation. Their support contributed effectively to our wider climate action plan, including the installation of a new solar farm and battery storage system. We were very satisfied with the work and will be considering CSD for future projects.”

CSD client

Morrison Data Services